Thursday, September 3, 2009

Leak

I came to the lab on Thursday to find out a the lab floor was covered in water. The culprit, was the plumbing on the lab above us leaked into our ceiling
Our microscope room floor was covered with water.

We had some really expensive equipments here, luckily most of it were covered with plastic and thank goodness none of the equipment short circuited.


There was so much water, it spilled out the door an into our main lab area.



Rye, En Nawi and I took turns moping up the excess water since the cleaners never made it to our lab.

No comments: